2003 Facility Master Plan
2004-08 Strategic Plan
2000-03 Technology Plan
Links
2003 Facility Master Plan


2003 Facility Master Plan

This website contains the 2003 Facility Master Plan. The 2003 Plan updates and revises the 1997 Master Plan based on the progress which has been made in achieving many projects in the 1997 Plan as well as current college space priorities. Major components of the Plan include: a status report on the achievement of facility initiatives outlined in the 1997 Plan; planning assumptions that guided institutional thinking about appropriate directions in future facilities development; and space goals in three areas (student affairs, academic affairs, and general administrative). A total of 32 future projects are identified in the Plan. Where appropriate, both written and architectural design concepts are provided.

To review the 2003 Master Plan please click on the links below. (Note: In order to view the text and/or visual components of the plan it may be necessary to click on the refresh button after you open each section of the plan.)

(The documents are in PDF format. Click here to download free Adobe Acrobat Reader.)

Many of the goals in the Facility Master Plan are based upon directions set in the College's 2000-04 Strategic Plan and 2000-03 Technology Plan. You may access these plans by clicking on the following: